Wednesday, April 17, 2013

Bathroom


Cleaning and retouching the upstairs bathroom 1 and 2
  1. Painting the wall
  2. Build the mirror and towel rack for 2 bathroom
  3. filling the tile grout 
  4. cleaned up with tile cleaning solution
  5. waterproofing


Mirror cabinet Build
                 The project was build using recycle wood from old fence ..The merbau wood have been exposed to tropical weather for about 8yrs ..  measuring 1 x 5 inch and 5 foot long.
After cleaned up and milling it to 7/8 x 4 inch the wood still in good condition.
Mirror cabinet build using Merbau Hardwood





Towel rack
   Using old Meranti wood plank 1x6 inch


Mortise and tenon joint with wedges



Bathroom 2
   this room had different layout so the cabinet and towel rack are on the same wall




No comments:

Post a Comment